When a plant cannot reach its rated throughput, the first instinct is often to add capacity. Sometimes the real limit is hidden in how material flows through existing equipment.
Signs worth checking
- Pressure drop higher than expected across a vessel, duct or distributor.
- Uneven temperature across a bed, tube bank or furnace section.
- Performance that changes with load in a way the design did not predict.
- Fouling or erosion in the same place every time, which often points to local velocity or recirculation.
- Scale-up that behaves differently from the pilot unit.
What to do next
Collect the operating data you already have, note where behaviour departs from design, and use a focused simulation to test whether flow distribution explains it. That is usually cheaper than guessing at a modification.